Migration plan template
A technical talk presenting a phased plan to retire a fictional library network's twelve-year-old catalogue server. It opens on a server with a sticky note, shows labelled sample risk figures, draws the dependency map and the dual-write design with boxes and connectors, sets out five phases with exit and rollback criteria, shows a labelled sample compare chart, weighs a big-bang alternative, gives the cutover runbook and lists what other teams must provide. Full script with cues and timing.
- Type
- Migration plan
- For
- Engineering teams and system owners
- Spoken
- 10:30 over 13 slides
- Look
- Monochrome
Slide 1 of 13
What you’ll saySlide 1 · 0:50
In a cupboard at the back of our main library, behind the spare chairs, there's a server with a yellowing sticky note on it. The note says: do not turn off.
PAUSE 2s
Nobody knows who wrote it. Nobody remembers when. But everyone obeys it, because that machine holds the catalogue for every branch in the network: every book, every loan, every reservation.
This is the plan to finally turn it off. On purpose, on a day we choose, without a single reader noticing. I'll cover what depends on it, the five phases, how we'll know each one is done, how we roll back, and what I need from other teams.
Practice timer0:00 – 0:50 of 10:30
Timed at a calm 130 words a minute, with the pauses in the cues.
Sample system · fictional figures. Charts and figures are illustrative.
What’s inside
Why we're moving
- Do not turn off
- What lives in that cupboard
- Everything that depends on it
- Why now, and why not leave it
The plan
- Copy the writes first. Move the reads last.
- Five phases
- During the copy phase
Safety
- Done when, and how we roll back
- What the nightly compare should show
- Why not just switch over one weekend?
The cutover
- Switching one app's reads
- What I need from other teams
Close
- Turn it off. On purpose.
What you’d replace
- The opening scene: the legacy system and why it matters
- Your risk figures
- Your dependency map
- Your phases, with exit and rollback criteria
- Your migration design, drawn
- Your cutover runbook and asks of other teams
Two ways to start
- Edit this template directly: the slides, script and cues open in the editor, ready for your names and numbers.
- Make it about your topic: SlideDeck keeps this structure, style and look, and drafts new slides from your own sources.